# Tasks

Add, assign and brief Tasks inside a Job, check team capacity, track time, send work for review, give Feedback or approve, and take work out of review.

A **Task** is a single unit of work inside a [Job](https://help.agencydesk.io/jobs/managing-jobs.md): two hours of account management, a round of copy amends, the animation on a social campaign, the design of a brand identity package. Traffic managers assign Tasks, the studio works them from [My Desk](https://help.agencydesk.io/my-desk/my-desk.md), and account executives follow their progress from the Job's **Tasks** tab (*Jobs > open a Job > Tasks*).

Because Agencydesk was built for agencies, a Task carries the full commercial picture rather than just done or not done. Every Task knows its rate, its estimate, who is working on it, who signs it off, how much time has been tracked against it, and whether it is billable. That is what lets one system run scope, schedule and billing without a spreadsheet in the middle.

Tasks are costed on the [Job Costing](https://help.agencydesk.io/jobs/job-costing.md), scheduled on the [Resource Planner](https://help.agencydesk.io/task-schedule/resource-planner.md), worked from [My Desk](https://help.agencydesk.io/my-desk/my-desk.md), measured on [Timesheets](https://help.agencydesk.io/task-schedule/timesheets.md), and billed through [Invoices](https://help.agencydesk.io/jobs/financial/invoices.md).

## Draft Tasks and active Tasks

Tasks appear in two places inside a Job, and the difference matters.

* [**Job Costing tab**](https://help.agencydesk.io/jobs/job-costing.md) — every Task on the Job, including **Draft** Tasks. This is the build view where you scope and price the work.
* **Tasks tab** — only Tasks that have been **activated**. This is the delivery view for the people doing the work.

The **Tasks** tab appears once the first Task is activated. Managers and above can still open the Timeline on a Job whose Tasks are all drafts, using its **Drafts** switch to review the schedule without activating work.

{% hint style="info" %}
**Great for** pitch work. Build a full costing of Draft Tasks to price a campaign, send the Estimate, and activate nothing until the Client approves. The studio never sees speculative work in their queue, and the Resource Planner stays clean.
{% endhint %}

## Add a Task

Tasks live inside [Groups](https://help.agencydesk.io/jobs/job-costing.md#groups). You need at least one Group on [Job Costing](https://help.agencydesk.io/jobs/job-costing.md) before adding a Task. Create and rename Groups there; Group headings on the Tasks tab are read-only.

{% stepper %}
{% step %}
Open the **Job Costing** tab and find the Group the Task belongs to.
{% endstep %}

{% step %}
Click **Add Task** at the bottom of that Group. The Task slider opens.
{% endstep %}

{% step %}
Select a **Task Type**. This pulls the [Department](https://help.agencydesk.io/company-settings/departments.md), the rate for the Job's [Billing Tier](https://help.agencydesk.io/company-settings/general/billing-tiers.md), the default estimated time and the default description from your [Task Types](https://help.agencydesk.io/company-settings/rate-card/task-types.md) on the Rate Card.
{% endstep %}

{% step %}
Add a **Task Name** if the Task Type needs more context. This is the only optional field.
{% endstep %}

{% step %}
Check the **Rate / Hour** and **Estimated Time**. Both carry a padlock showing whether the value is locked to the Rate Card.
{% endstep %}

{% step %}
Set **Billable** on or off, and edit the **Description** if this Job needs different wording from the Task Type default.
{% endstep %}

{% step %}
Click **ADD DRAFT TASK**. The Task lands in the Group with a **Draft** status.
{% endstep %}
{% endstepper %}

### How Tasks are named

A Task label is built from two parts:

`Task Type` + `Task Name`

The [**Task Type**](https://help.agencydesk.io/company-settings/rate-card/task-types.md) comes from the Rate Card. The **Task Name** is what you type when creating the Task. Together they read as one label:

* `Animation - LinkedIn Post Animation`
* `Account Management - Internal Review`
* `Web Development (Front-end) - Home Page Styling Update`

Some Task Types carry enough meaning on their own, which is why the Task Name is optional. **Account Management** reads fine with nothing after it. Others need context: **Animation** tells you the discipline, **Animation - Story Logo** tells you the deliverable.

{% hint style="info" %}
**Great for** monthly retainers. Six animations in one month all share the Animation Task Type, so the rate and the Department stay consistent, while the Task Names keep the deliverables apart for the traffic manager and on the Invoice.
{% endhint %}

### Keep a typed description when changing Task Type

Changing Task Type on a new Task replaces an empty or unchanged standard description with the new type's default. If you wrote your own description, **Replace description?** offers **Keep mine** or **Replace**. A type with no default keeps your text. Check the rate, estimate and Billable setting afterwards, as those can still update.

## Activating a Task

A Task can be activated from these controls:

* The [**Active** switch](https://help.agencydesk.io/jobs/job-costing.md#the-active-toggle) at the end of the Task's row on Job Costing.
* The **Activate Task** switch at the bottom of the Task tab in the Task slider, when you opened the Task from Job Costing.
* On the **Timeline**, switch **Drafts** on, click the Task's **Draft** tag and choose **Activate task**. This requires Manager access or higher on an open Job.

Activating a Task moves it onto the **Tasks** tab, makes it bookable on the [Resource Planner](https://help.agencydesk.io/task-schedule/resource-planner.md), allows people to be assigned, allows a reviewer to be added, and allows time to be tracked. It also takes the [Job's start and end dates](https://help.agencydesk.io/jobs/managing-jobs.md#create-a-job) if it has none of its own. Activating the first Task on a Job also moves the [Job itself from Draft to Active](https://help.agencydesk.io/jobs/managing-jobs.md#activate-a-job).

A Draft Task shows only its Estimated Time, Additional Time, Rate/Hour, Billable state and the Activate Task switch. Start and Due dates, assigned people, reviewers and tracked time appear once it is active.

{% hint style="warning" %}
A Task can only be set back to Draft if no time has been tracked against it, it has not been [invoiced](https://help.agencydesk.io/jobs/financial/invoices.md) (even partially), and it has no Resource Planner bookings for today or later. If planned time blocks the change, **Cannot Deactivate** explains why and the switch returns to Active. Use **Go to Task**, or choose a person when several are listed, to review their bookings in the Planner. Resolve the bookings before trying again.
{% endhint %}

## The Tasks tab

The Tasks tab is where the Job's live work sits. Tasks are listed inside the same [Groups](https://help.agencydesk.io/jobs/job-costing.md#groups) as on Job Costing. Click a Group's heading band, or its **–** / **+**, to collapse or expand it.

### Above the list

<figure><img src="https://1157247567-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FB7D6eF196PUKFr153UEk%2Fuploads%2FIYVUnChm7t7LMG9CtUfz%2Fagencydesk-job-tasks-overview-2.png?alt=media" alt="Job Tasks tab with Account Executive, Time Recon and Timeline cards above the Task list"><figcaption><p>The cards above the Tasks show who runs the Job, time used and the next Milestone.</p></figcaption></figure>

The Tasks tab opens with a row of summary cards above the live work:

* **Account Executive** — the Job's [Account Executive](https://help.agencydesk.io/jobs/managing-jobs.md#create-a-job), with their profile picture.
* **Time Recon** — the share of the Job's estimated hours already tracked, for example `56%`, with a chip saying how much time is left (`24:00 left`) or over (`01:03 over`), and the hours beneath, for example `31:00 of 55:00 hours tracked`. The share is green within the estimate and pink once it is passed; a Job without estimated hours shows **No estimate**. The icon at the top right opens the Job's [Recon](https://help.agencydesk.io/jobs/recon.md) tab. This card is shown to Managers, Finance, Admins, Super Users and the Account Owner.
* **Timeline** — the Job's dates, any overdue Milestones, the next open Milestone with the time to go, and **Milestones** done out of the total, for example `1/3`. Click the diamond button, the dates or the pills to open the Milestone rail underneath the cards. See [the compact Milestone timeline](https://help.agencydesk.io/jobs/timeline.md#read-the-compact-milestone-timeline-on-the-tasks-tab). On an open Job with no Milestones, Managers and above see **Add one**; on the open rail they can hover and click an empty day to create a Milestone.

{% hint style="info" %}
**Great for** a weekly WIP meeting. Time Recon at 52% on a Job that is two thirds through its dates is the conversation you want to have before the overrun, not after it.
{% endhint %}

### Filter and search the list

Above the Tasks are two status tabs with live counts:

* **Active** — Tasks still in production.
* **Completed** — Tasks whose master Complete control has been set.

**Search** on the right finds a Task by name in a long list.

### Task order

Job Costing sets the saved order of Groups, Tasks and Costs, and the Tasks tab and Timeline follow it. Changing a Task's start or due date does not move its row. To change the order, drag rows on Job Costing, use a Timeline bar's grip, or use a Group's **Arrange waterfall** on the [Timeline](https://help.agencydesk.io/jobs/timeline.md) to sort it by date.

### The columns

| Column             | What it shows                                                                                                                                                                                              |
| ------------------ | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| **Group and Task** | The Group heading, then each Task beneath it                                                                                                                                                               |
| Tags               | The Task's [Global Tags](https://help.agencydesk.io/company-settings/general/global-tags.md), stacked. Hover an untagged Task to add one with **+**                                                        |
| **Status**         | **Scheduled** (green) when time is booked on the Resource Planner; otherwise **In Progress** or **Overdue**, or **Complete**. Hover an unscheduled Task with people assigned to show a **Schedule** button |
| **Assigned to**    | Profile pictures of assigned people, each with a ring showing their tracked time against their estimate. A grey add-person icon shows when nobody is assigned                                              |
| **Date Range**     | The Task's start and due dates, with a countdown beneath                                                                                                                                                   |
| **Time**           | Time tracked against estimated time, for example `04:28 / 15:00`                                                                                                                                           |

Click **Scheduled** or **Schedule** to open the Task on the Resource Planner. When several people are assigned, choose whose bookings to open.

The countdown under **Date Range** shows something like `3 days` while there is still time, then **Overdue** once the due date has passed. A profile picture's ring is green while that person is within their estimate and turns pink once they reach or pass it. A small green tick at the top left of a profile picture means that person's part is complete. Everyone on a completed Task, or on a closed Job, shows the tick.

### Reading a Task line

Next to the Task name:

* **Ticked circle** — the Task is complete.
* **Orange In review badge** — the Task is in review. Click it (*In review – open Reviews*) to open the Task straight on its **Reviews** tab.
* **Paperclip with a number** — documents are attached to the Task. Click it to open the Brief tab.
* **Speech bubbles with a number** — [Notes](#notes-tab) have been added. Click to open the Notes tab.
* **Blue diamond** — the Task has linked Milestones. See [Milestones on the Tasks tab](#milestones-on-the-tasks-tab).
* **Pencil** and **diamond** on hover — [edit](#edit-a-task) the Task, or create a Milestone for it.

Underneath the Task name:

* **Task Brief** — shows only when the Task has a [Brief](#brief-tab).
* **Amendments** — each [Amendment](#briefs-and-amendments) is listed by its label, with its extra time beside it, for example `More Time 05:00`.

Click a Task Brief or Amendment label to open it on the Brief tab.

{% hint style="info" %}
**Great for** spotting scope creep early. A Task with three Amendments stacked under its name is a Task that has grown since it was quoted. An account executive can see that from the list without opening a single Task.
{% endhint %}

### Milestones on the Tasks tab

{% stepper %}
{% step %}
On an open Job's **Tasks** tab, hover an unfinished Task to show its diamond, labelled **Create Milestone**. The Group heading also has a diamond while it contains unfinished work. Manager access or higher is required.
{% endstep %}

{% step %}
Click the diamond. The Milestone popup opens with the Task or Group already linked. Check the suggested name and date; accept the name or type your own.
{% endstep %}

{% step %}
Choose the intended date and click **Create Milestone**. Nothing is saved until you do.
{% endstep %}
{% endstepper %}

A blue outline diamond that stays visible after a Task or Group name means it already has linked Milestones; a number shows when there are several, and a collapsed Group includes the Milestones on its hidden Tasks. Hover for the names and dates. With Manager access or higher on an open Job, click it to open the Milestone, or choose one when there are several. Milestone status (overdue or done) is shown on the [Timeline](https://help.agencydesk.io/jobs/timeline.md), not on this list.

## The Task slider

All of a Task's detail lives in the **Task slider**. It opens when you click a Task on the [Job Costing](https://help.agencydesk.io/jobs/job-costing.md) tab, the **Tasks** tab, the [Timeline](https://help.agencydesk.io/jobs/timeline.md), the [Resource Planner](https://help.agencydesk.io/task-schedule/resource-planner.md) or your [My Desk](https://help.agencydesk.io/my-desk/my-desk.md).

The header shows:

* The master **Complete** circle to the left of the Task label, for Managers and above. Hover it to read **Complete** or **Reopen**.
* The Task label, with a **link icon** that copies a direct link to the Task.
* The Job number and name beneath. Click it to open the Job; the **copy icon** beside it copies the Job reference. **Closed** shows when the Job is closed.
* The Task's status tag: **Draft**, **Active**, **Overdue**, **In Review** or **Complete**.
* A **...** menu with **Edit** and **Delete** (Managers and above) and **Take out of review** (while the Task is in review). On a closed Job, Managers see **Delete** only. A completed Task has no menu.
* The Task's [Global Tags](https://help.agencydesk.io/company-settings/general/global-tags.md), with **+** to add more.

The slider has five tabs: **Task**, **Brief**, **Notes**, **Time** and **Reviews**.

## Task tab

<figure><img src="https://1157247567-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FB7D6eF196PUKFr153UEk%2Fuploads%2Fue9n2Gzt6sGjPArz40pH%2Fagencydesk-task-details-assigned-team.png?alt=media" alt="Task tab with dates, estimated and additional time, rate, total time tracked and three people under Assigned to"><figcaption><p>The Task tab shows the time budget and each person's progress.</p></figcaption></figure>

The Task tab is the working view of the Task.

| Field                  | What it shows                                                                                                                                                                        |
| ---------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ |
| **Start** and **Due**  | The Task's date range. Active Tasks only                                                                                                                                             |
| **Estimated Time**     | The hours costed for the Task                                                                                                                                                        |
| **Additional Time**    | Hours added by [Amendments](#briefs-and-amendments), on top of the estimate                                                                                                          |
| **Rate/Hour**          | The rate from the [Rate Card](https://help.agencydesk.io/company-settings/rate-card/task-types.md). Shown to Admins and above, and to people with **Can see rates** on their profile |
| **Billable**           | Yes or No                                                                                                                                                                            |
| **Total Time Tracked** | Time tracked across everyone assigned, against the estimate. Appears once the Task is active and has people assigned                                                                 |

Beneath that sit two sections. **Assigned to** lists everyone doing the work, and **Reviewed by** lists the [reviewer](#reviews), if one has been set. Each person shows their status tag (**Active**, **In Review**, **Complete**, **Deactivated** or **Inactive User**), their tracked-against-estimated time, a progress bar and a **...** menu.

Progress bars are green while a person is inside their estimated time and turn pink once they reach or pass it, so an overrun is visible at a glance rather than at month end.

### Open a person's planned time

{% stepper %}
{% step %}
Open an active Task's slider and find the person under **Assigned to**. With Manager access or higher, the Resources icon beside their time bar opens their Task in the Resource Planner.
{% endstep %}

{% step %}
Hover the icon to read planned time and time still to plan. Green means there is time still to plan; amber means nothing remains to plan; blue means no estimate is available. This is a booking indicator, not the person's completion status.
{% endstep %}

{% step %}
Click the icon. The Planner opens on that person with the Task highlighted, and the slider closes. Book or change their hours there. The icon is not shown for completed or inactive assignments, closed Jobs, templates, or while you are already on the Planner.
{% endstep %}
{% endstepper %}

## Assigning users

<figure><img src="https://1157247567-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FB7D6eF196PUKFr153UEk%2Fuploads%2FtFHYtFl7wFtcV3pOS1Xq%2Fagencydesk-assign-team-capacity.png?alt=media" alt="Assign popup listing people with their Department, capacity percentage, tracked time and an on/off switch"><figcaption><p>Capacity shows how much of each person's time is still free.</p></figcaption></figure>

Managers and above assign people to active Tasks. Open the assign popup from any of these:

* **The Tasks tab** — click the grey add-person icon when nobody is assigned, or click the profile pictures.
* **The Task slider** — click **Assign a User** on the Task tab.
* **Edit Task** — use **Assign a User** under **Assigned to**.
* **The Timeline** — click the profile pictures on the Task's row.

The popup is headed with the Task name and the Job name, with **Search** and a close button. It lists your timesheet users in two columns:

* **Assign To** — the person's name, with their [Department](https://help.agencydesk.io/company-settings/departments.md) beneath it.
* **Capacity** — how much of their time is still free over the next two weeks of scheduled work, as a percentage. People already on the Task also show their own tracked time against their share of the estimate, with a progress bar.

Switch a person on to assign them, or off to remove them. People whose user account is inactive can't be switched on.

### Who is listed first

* People already on the Task are at the top.
* Then people in the same Department as the Task Type, so the people who actually do this kind of work are the first ones you see.
* Then everyone else, by first name.

When you switch someone on, they slide up to the top a moment later; switch them off and they move back down. You can switch several people in a row before the list re-sorts. Search searches names, usernames and email addresses, and scrolls the list back to the top.

### Read capacity

**Capacity** is colour coded, and it reads as free time rather than workload:

* **Green**, 50% and above — plenty of capacity left. Book the time.
* **Orange**, 20% to 49% — filling up. Check what else they are carrying first.
* **Pink**, below 20% — close to full. Assigning more work here will push something else out.

Capacity comes from each person's **Working Hours** under [Users](https://help.agencydesk.io/company-settings/users.md) and their booked work, the same figures the [Resource Planner](https://help.agencydesk.io/task-schedule/resource-planner.md#read-a-persons-capacity-bars) uses for its capacity bars.

### See someone's next 7 days

{% stepper %}
{% step %}
In the assign popup, click a person's capacity percentage (*Show the next 7 days*).
{% endstep %}

{% step %}
Seven small blocks replace the percentage, starting with today. Hover them to see the day letters (M T W T F S S).
{% endstep %}

{% step %}
Read each day: the green fill shows how full that day is with booked Task time, meetings and part-day leave, against that day's working hours. A full **pink** block means the day is overbooked. An **x** means a day off with nothing booked, or a full day of leave.
{% endstep %}

{% step %}
Click the blocks to return to the percentage. You can open several people's weeks at once to compare them.
{% endstep %}
{% endstepper %}

{% hint style="info" %}
The percentage and the 7 days answer different questions. The percentage covers two weeks and does not count leave; the 7 days show this week day by day, leave included. A day matches that person's bar on the Resource Planner.
{% endhint %}

{% hint style="success" %}
**Example.** A traffic manager is assigning the key visual for a product launch. Both senior designers show 35% in orange. Opening their next 7 days shows that one is fully booked until Thursday and then almost free, while the other is on leave on Friday. The Task is due next Tuesday, so the first designer gets it, and the time is booked from Thursday.
{% endhint %}

The Agencydesk support login is never offered in this list.

## Tag a Task

The **+** beneath the Job reference in the Task slider adds [**Global Tags**](https://help.agencydesk.io/company-settings/general/global-tags.md) to the Task. Tags come from the shared pool used across the account, and a Task can carry as many as you need. Tags show as coloured pills on the Task slider, the Tasks tab and [My Desk](https://help.agencydesk.io/my-desk/my-desk.md) cards.

{% stepper %}
{% step %}
Click **+**. The **Tags** list opens, with a count such as **2 on this task**.
{% endstep %}

{% step %}
Tags already on the Task are ticked. Click a tag, or press Enter or Space on it, to add it; click a ticked tag to take it off. Use **Search tags** when the list is long.
{% endstep %}

{% step %}
Admins and above can click **Manage** to add a **New tag** or change a tag with its **pencil**, without leaving the Task. A new tag is put on the Task straight away. Tags are deleted in [Settings](https://help.agencydesk.io/company-settings/general/global-tags.md#edit-or-delete-a-global-tag), because that affects every Job and Task.
{% endstep %}
{% endstepper %}

{% hint style="info" %}
**Great for** cutting across the Job structure. Tagging every Task waiting on Client feedback, everything flagged as a bug, or everything tied to one media buy gives you a view of the work that Groups alone cannot.
{% endhint %}

## Complete a Task

Completion works at two levels: the whole Task, and each person's part of it.

### The master Complete control

The circle to the left of the Task label at the top of the Task slider is the master control for the whole Task. It is available to Managers and above, and turns solid green with a tick when the Task is complete.

* Clicking it marks **every assigned person** complete at once.
* Clicking it again marks **every assigned person** active again.
* When every assigned person has been marked complete individually, the master control turns **Complete** on its own.

A Task can therefore sit **Active** while one person on it is already marked complete. That is normal: their part is finished while someone else is still going.

{% hint style="info" %}
**Great for** split deliverables. On a brand identity package with two designers, the one handling logo refinement can close out their part while the other is still working through co-branding guidelines. The Task stays open, but the finished work leaves the Resource Planner.
{% endhint %}

A Task marked complete also counts in full towards the [Billable](https://help.agencydesk.io/jobs/financial.md#the-financial-dashboard) figure on the Job's Financial tab, even where no time was tracked against it.

### The person menu

Each assigned person's **...** menu is available to Managers and above, and to the person themselves on their own row. It has two options.

#### Mark Completed

Completing a person's part:

* Adds a **Complete** tag above their progress bar, and a small green tick to their profile picture here and on the Tasks tab and Timeline.
* Removes the Task from the [**Resource Planner**](https://help.agencydesk.io/task-schedule/resource-planner.md) for them, so it cannot be booked again and does not take up space.
* Moves the Task into the **Completed** column on their [**My Desk**](https://help.agencydesk.io/my-desk/my-desk.md).

The option then reads **Mark Not Completed**. Anyone, including basic Users, can use it on their own row to reopen their part after completing it by accident, even when that completed the whole Task.

{% hint style="info" %}
The **Completed** column on My Desk only shows completed Tasks from **active Jobs**. Once a Job is [closed](https://help.agencydesk.io/jobs/managing-jobs.md#close-a-job), its Tasks drop out of that column so it does not build up over time.
{% endhint %}

#### Deactivate User

The option then reads **Reactivate User**. Deactivating a person:

* **Dims** their profile picture and progress bar, and tags them **Deactivated**.
* Removes the Task from their [**Resource Planner**](https://help.agencydesk.io/task-schedule/resource-planner.md).
* Removes their profile picture from the Tasks tab.
* **Sets their estimated time to exactly what they tracked**, and carries the remaining time over to the other active people on the Task.
* **Removes them from the Task entirely** if they have tracked no time at all.

The time redistribution is the part worth understanding, so here it is worked through.

{% hint style="success" %}
**Example.** A Task is estimated at **5:00** with two designers assigned, so each carries **2:30**.

Both track an hour. Each now sits at `01:00 / 02:30`, with **1:30 remaining**.

The first designer is deactivated. Their estimate drops to **1:00**, exactly what they tracked, and their remaining **1:30** carries across to the second designer, who now sits at `01:00 / 04:00` with **3:00 remaining**.

The Task total stays at 5:00. Nothing is lost and nothing is invented.
{% endhint %}

This is what you want when two people were put on a Task and it becomes clear that one of them will carry it. The estimate follows the work rather than the original guess.

## Edit a Task

The **...** menu at the top right of the Task slider holds **Edit** and **Delete**. A Task can also be edited from the **pencil** that appears on hover on the Tasks tab, or from the row actions on [Job Costing](https://help.agencydesk.io/jobs/job-costing.md#edit-duplicate-or-delete-a-line-item).

Edit mode opens the Task's fields in place:

* **Task Name**
* **Rate / Hour** and **Estimated Time**, each with a padlock
* **Billable**
* **Start Date** and **Due Date**, each with a date picker
* **Adjust Job Dates** — tick this when the Task's dates fall outside the [Job's own date range](https://help.agencydesk.io/jobs/managing-jobs.md#create-a-job) and the Job should move to fit them
* **Description**
* **Assigned to**, with a switch per person
* **Reviewed By**, with the review's **Estimated Time** and **Reserve Time**

Click **SAVE** to keep your changes, or **CANCEL**.

### Rate and estimate lock on activation

{% hint style="warning" %}
An Active or In Review Task shows padlocks on Rate / Hour and Estimated Time. Managers and Finance can use the unlock control when permitted. A Task on a draft or issued Invoice is locked with no override; remove its line from the draft Invoice, or use the issued-Invoice cancellation workflow, first.
{% endhint %}

A Task on a draft or issued Invoice also locks its **Task Name** and **Description**, shown with a padlock; hover it for the reason. The Invoice keeps its own copy of the line, so the Job Costing stays the same as what the Client received.

For additional scope, add an [Amendment](#adding-an-amendment) so the extra time has a reason and an author. Do not use a rate or estimate change to hide work already done.

### When new dates leave bookings outside

{% stepper %}
{% step %}
In Edit Task, change **Start Date** or **Due Date** and click **SAVE**. If bookings from today onward would sit outside the new range, **Planned Time Outside Task Dates** opens before saving.
{% endstep %}

{% step %}
Review the people, dates and hours. **Back** returns to editing without saving; **Save Anyway** saves the dates but leaves the bookings where they are.
{% endstep %}

{% step %}
Use **Go to Planner** beside a person to save the dates and open the Task highlighted at their booking. A failed save does not navigate. Review and reschedule the bookings deliberately.
{% endstep %}
{% endstepper %}

Closing the warning is the same as **Back**. Moving Task dates does not move or delete bookings automatically.

### Delete a Task

{% hint style="warning" %}
A Task can only be deleted if **no time has been tracked** against it and it has **not been** [**invoiced**](https://help.agencydesk.io/jobs/financial/invoices.md). Where a Task has already used time, deactivate the person instead so the tracked time keeps its record.
{% endhint %}

### When Draft or Delete is blocked by a timer

If a running or parked timer blocks the action, Agencydesk opens **Timer Not Committed** or **Timers Not Committed**. Review the people, Tasks, elapsed time and timer status. **Cancel** leaves the action and timers as they were. **Discard Timer** or **Discard Timers** permanently removes the listed uncommitted time and continues the original action.

## Reviews

A **Review** is a formal sign-off step on a Task. Rather than approvals happening in a chat thread nobody can find later, the request, the response and the outcome are recorded on the Task, and the reviewer's time is tracked like any other work.

{% hint style="info" %}
**Great for** agencies that want creative direction and quality-check time accounted for. A creative director spending fifteen minutes checking a set of social posts is real studio time. The review workflow puts it in their time logs instead of losing it.
{% endhint %}

### Who can be a reviewer

Only people with **Can review work** ticked on their profile under [Users](https://help.agencydesk.io/company-settings/users.md) appear in the **Reviewed By** list. If nobody qualifies, the list reads *No reviewers assigned yet* with a link to Users.

A reviewer can only be added once the Task has been activated.

### Add a reviewer

{% stepper %}
{% step %}
Open the Task slider and choose **Edit** from the **...** menu.
{% endstep %}

{% step %}
At the bottom, open **Reviewed By** and choose the reviewer.
{% endstep %}

{% step %}
Set the **Estimated Time** for the review itself, for example `00:15`.
{% endstep %}

{% step %}
Set the **Reserve Time** switch, which decides how that time behaves. See [How review time is handled](#how-review-time-is-handled).
{% endstep %}

{% step %}
Click **SAVE**.
{% endstep %}
{% endstepper %}

A **Reviewed by** section now appears on the Task tab beneath **Assigned to**, showing the reviewer, their status tag and their tracked time against the review estimate. The reviewer and review estimate can't be changed while the Task is in review.

### How review time is handled

The **Reserve Time** switch beside the review estimate has two states, and they do different things.

#### Reserve Time off

The review time sits outside the Task altogether. It is non-billable, it does not change the Task's **Estimated Time**, and it does not appear as **Additional Time**. It shows on the review only, as a guide to the reviewer of how much time they have.

Use this when the agency is absorbing the review. The time is still visible and tracked; it just does not touch what the Client is charged.

#### Reserve Time on

The review time is reserved out of the time already allocated to the people doing the work. The Task's **Estimated Time** does not move. What changes is how that estimate is divided between the team.

{% hint style="success" %}
**Example.** A Task is estimated at **2:00** with two people assigned, so each carries **1:00**.

A reviewer is added with **00:30**, and **Reserve Time** is switched on.

Each assigned person drops to **00:45**, and the Task's Estimated Time still reads **2:00**.

The thirty minutes has been carved out of the allocation rather than added to the Job.
{% endhint %}

{% hint style="info" %}
**Great for** fixed-price deliverables. When a website build is quoted at a number the Client has already signed off, the creative director's review time has to come out of that number rather than growing it. Reserve Time keeps the quote intact and still puts the review hours where they belong.
{% endhint %}

### The reviewer menu

The **...** menu next to the reviewer holds:

* **Mark as Reviewed** (or **Mark as Not Reviewed**) — close the review off directly, or reopen it.
* **Remove Reviewer** (or **Assign Reviewer**) — take the reviewer off the Task, or put them back.

### Send a Task for review

{% stepper %}
{% step %}
With a reviewer set, commit your time on [**My Desk**](https://help.agencydesk.io/my-desk/my-desk.md) and tick **Send for Review**.
{% endstep %}

{% step %}
The Task moves into your **In Review** column and its status tag changes to **In Review**.
{% endstep %}

{% step %}
The Task lands in the reviewer's **For Today** column as a **For Review** card, highlighted so it stands out from their own work. It stays there until they review it.
{% endstep %}
{% endstepper %}

If a Task is in review but has no reviewer, its **Reviews** tab shows **No reviewer assigned.** Choose a reviewer from the list and click **Assign Reviewer** so the review can continue.

### Respond to a review

The assigned reviewer sees a blue **Review** button on a pending request in the Task's **Reviews** tab. **Can review work** makes someone available to choose as a reviewer; it does not let every reviewer answer someone else's request. An assigned reviewer can also review their own submission.

{% stepper %}
{% step %}
Open the Task's **Reviews** tab and click **Review** on the pending request.
{% endstep %}

{% step %}
Choose **Feedback** to ask for changes, or **Approve** to sign off the work.
{% endstep %}

{% step %}
Enter your **Review feedback**. If you choose **Approve**, leave **Mark task complete for me** unticked unless the whole Task is finished. Ticking it completes the Task for **all assigned team members**.
{% endstep %}

{% step %}
Click **Submit Review**, then check the response in the **Reviews** tab.
{% endstep %}
{% endstepper %}

Each request records its own response. On a Task shared by several people, another person's request can still be pending after you submit a review.

### Record review time and Feedback together

Use the **For Review** card in your **For Today** column when you want to record the time you spent reviewing as well as give a response.

{% stepper %}
{% step %}
Start the timer on the For Review card and do the review.
{% endstep %}

{% step %}
Click **Commit Time** in the tracker. Check **Time to submit** and enter your **Review feedback**.
{% endstep %}

{% step %}
Choose **Feedback** or **Approve**. If approving, tick **Mark task complete for me** only when the Task is finished for everyone.
{% endstep %}

{% step %}
Click **Submit Time and Review**. Check the time entry and the response in the Task's **Reviews** tab.
{% endstep %}
{% endstepper %}

{% hint style="info" %}
If the popup says **Time saved; remaining action failed**, keep it open and click **Retry remaining action**; your time is not saved twice. If it cannot identify a single pending review, open the Task's **Reviews** tab and check the request before submitting.
{% endhint %}

{% hint style="success" %}
**Example: a creative director gives Feedback on a key visual.** A designer at the agency finishes the key visual for Bloom Skincare's summer launch, commits 3 hours on My Desk and ticks **Send for Review**. The creative director sees it under **For Review** in For Today, starts the timer, checks the layout against the brand guidelines and spends 20 minutes on it. In **Commit Time** they choose **Feedback** and write: *"Product shot needs more space; try the headline in the brand serif."* They click **Submit Time and Review**. The 20 minutes land on the creative director's timesheet, and the designer sees the Task in their In Review column with an orange **Feedback** tag. After the changes, the designer sends it for review again, and this time the creative director chooses **Approve**.
{% endhint %}

### What the person who sent it sees

The reviewer's answer shows on the Task card on the sender's My Desk:

* **Feedback** (orange) — the reviewer asked for changes. The Task stays in your **In Review** column, with its timer button back so you can work on the changes. It does not also appear in For Today. When the changes are done, commit your time and tick **Send for Review** again.
* **Approved** (blue, with a thumbs up) — the reviewer signed off the work.

The full message is on the Task's **Reviews** tab.

### Take work out of review

Use **Take out of review** when submitted work needs to be worked on again before the reviewer answers. There are two actions, with different scopes.

#### Take your own part out of review

{% stepper %}
{% step %}
Find the Task in **In Review** on My Desk and click its undo arrow (**Take out of review**). The arrow replaces the timer while your work is in review.
{% endstep %}

{% step %}
Read the confirmation and click **Take out of review**. Other people who submitted their part stay in review.
{% endstep %}
{% endstepper %}

#### Take everyone assigned out of review

{% stepper %}
{% step %}
Open the Task slider and choose **Take out of review** from the **...** menu. This is available to assigned team members and to Managers and above while the open Job's Task is in review.
{% endstep %}

{% step %}
Read the confirmation that it affects everyone assigned, then click **Take out of review**. Check the refreshed Task before continuing.
{% endstep %}
{% endstepper %}

{% hint style="info" %}
The whole-Task action closes pending review requests. It does not stop other people's running timers. Check the Task and tell the team before they submit more time.
{% endhint %}

### Read the Reviews tab

The **Reviews** tab keeps the Task's review history. Requests waiting for your response appear first, followed by the most recent entries. Each entry shows:

* The requester's profile picture, name, and the date and time the review was requested.
* The message they sent with the request.
* The outcome tag on the right, or a **Review** button if it is waiting for you.
* The reviewer's reply nested beneath, as **Response by** with their name, date and time.

Outcome tags read:

| Tag          | Meaning                                       |
| ------------ | --------------------------------------------- |
| **Pending**  | Requested, not yet reviewed                   |
| **Feedback** | Reviewed with changes requested               |
| **Approved** | Signed off                                    |
| **Complete** | Closed without a Feedback or Approve response |

Because each round is a separate entry, a Task that went through three passes shows all three, with what was asked and what came back each time.

{% hint style="info" %}
**Great for** defending scope on a fixed-price deliverable. When a Client insists a fourth round was always included, the Reviews tab shows exactly what was requested, when, and what was approved.
{% endhint %}

### Review time

Time a reviewer tracks against a review is added to **their** time logs, the same as any other tracked time, and appears on their [Timesheet](https://help.agencydesk.io/task-schedule/timesheets.md). The For Review card appears in their For Today column in light orange, so review work stands apart from the work they own.

## Brief tab

The Brief tab holds the instruction for the Task and every change to that instruction since.

A new Task starts with no Brief. Briefs are **not saved with** [**Job Templates**](https://help.agencydesk.io/company-settings/job-templates.md), so a Brief is always written fresh on the Job it belongs to. To start from the same wording each time, use a [Brief Template](https://help.agencydesk.io/company-settings/brief-templates.md).

An empty Brief tab shows **Add Brief** and **Add Amendment** side by side. Both are optional, and an Amendment can exist without a Brief. Once there is a Brief or an Amendment, **Add Amendment** moves to the right of the **Amendments** heading, just above the Amendments. While one form is open, the other Add button is hidden so it cannot replace the form being written.

{% hint style="info" %}
When a Task is referenced from the [Job Brief](https://help.agencydesk.io/jobs/managing-jobs.md#write-the-job-brief) using the `%` shortcut, a **More in Job Brief** link appears at the top of this tab. It opens the Job Brief at that section.
{% endhint %}

### Briefs and Amendments

They are essentially the same thing, with one difference that matters commercially.

* A **Brief** assumes the time already estimated on the Task covers the work described.
* An **Amendment** can carry additional time, which is **added to the Task's overall estimate** and shown as **Additional Time** on the Task tab.

An Amendment left with no time is set to `0:00`, meaning the extra work has to fit inside the existing estimate.

{% hint style="info" %}
**Great for** keeping scope honest on a retainer. When a Client asks for a second round of home page styling that was never quoted, add it as an Amendment with the hours attached. The estimate moves, the studio sees the reason, and the conversation about the extra time happens now rather than at recon.
{% endhint %}

An Amendment is also the right route when a Task needs more hours, because the [rate and estimate lock](#rate-and-estimate-lock-on-activation) once the Task is active.

### Add a Brief

{% stepper %}
{% step %}
Open the **Brief** tab and click **Add Brief**. The **New Brief** form opens.
{% endstep %}

{% step %}
Write the Brief under **Details**. Formatting includes bold, italic, underline, strikethrough, bulleted, numbered and checklists, text alignment, tables, links and an info block. Images can be pasted in, which is how colour palettes and reference visuals usually get there. If your agency has [Brief Templates](https://help.agencydesk.io/company-settings/brief-templates.md) for this kind of Task, click **Use Template** beside **Details** to start from one.
{% endstep %}

{% step %}
Drop files into **Documents**, or click **browse** to select them.
{% endstep %}

{% step %}
Click **Add Brief** at the bottom of the form. The buttons stay in view while you scroll a long Brief.
{% endstep %}
{% endstepper %}

### Adding an Amendment

<figure><img src="https://1157247567-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FB7D6eF196PUKFr153UEk%2Fuploads%2Fj1JogosoDkUkuOzMAAR4%2Fagencydesk-task-brief-amendments-revisions-2.png?alt=media" alt="Brief tab with a Task Brief and three numbered rounds of Amendments adding extra time"><figcaption><p>Each round of changes is its own Amendment, so the extra time is visible at a glance.</p></figcaption></figure>

{% stepper %}
{% step %}
Open the **Brief** tab and click **Add Amendment**. The **New Amendment** form opens.
{% endstep %}

{% step %}
Give it an **Amendment Label**, for example *More Time* or *Round 2 changes*. The label is required, and it is what shows on the Tasks tab.
{% endstep %}

{% step %}
Set **Extra Time** with the clock picker if the Amendment carries extra hours. Leave it at `00:00` if the work must fit the existing estimate.
{% endstep %}

{% step %}
Write the Amendment under **Details**, which is required, or click **Use Template** to start from a [Brief Template](https://help.agencydesk.io/company-settings/brief-templates.md). Attach any documents.
{% endstep %}

{% step %}
Click **Add Amendment**.
{% endstep %}
{% endstepper %}

**Cancel** closes an untouched form straight away. If you have written anything, it asks first; see [Recover an unsaved Brief or Amendment](#recover-an-unsaved-brief-or-amendment).

### Record shortcuts in a Task Brief or Amendment

{% stepper %}
{% step %}
Type a shortcut in the editor, then start typing the record's name or number.
{% endstep %}

{% step %}
Choose the matching result to insert the tag. Type more of the name or number if the first results do not include it.
{% endstep %}

{% step %}
Save the Brief or Amendment to keep the tag with the instruction.
{% endstep %}
{% endstepper %}

| Shortcut | To reference   |
| -------- | -------------- |
| @        | User           |
| #        | Job            |
| $        | Client         |
| ^        | Supplier       |
| <        | Cost Estimate  |
| >        | Invoice        |
| \~       | Purchase Order |

**@** and **#** are available to Users and above. Client, Supplier and financial record tags require Manager access or above. The suggestions depend on your access and the records available.

The [Job Brief](https://help.agencydesk.io/jobs/managing-jobs.md) also offers shortcuts for that Job's Tasks, Costs and attached Client and Supplier documents. Those extra shortcuts are not offered in a Task Brief or Amendment.

{% hint style="info" %}
Tagging someone with **@** in a Brief or Amendment records who the instruction concerns and sends them a [notification](https://help.agencydesk.io/my-desk/notifications.md) when you save. Only people newly tagged in that save are notified; editing the Brief later does not notify people who were already tagged.
{% endhint %}

### How the Brief tab reads

<figure><img src="https://1157247567-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FB7D6eF196PUKFr153UEk%2Fuploads%2FEr5wrtJWBqnAPKP4qpt7%2Fagencydesk-task-amendment-added-time-2.png?alt=media" alt="Task slider Brief tab with the Total time line, a closed Task Brief and two Amendments, one open showing a specs table and checklist"><figcaption><p>The Brief stays pinned at the top; Amendments follow, newest first, with their extra time.</p></figcaption></figure>

The **Task Brief** is pinned at the top. Beneath it, the **Amendments** heading shows how many there are, and the Amendments follow **newest first**, like a feed. They are numbered from the oldest, so *Amendment 1* is the first one added.

When a Task has Amendments, the Brief starts closed and the newest Amendment opens, so the latest change is the first thing you read. Click any card's header to open or close it.

A **Total time** line above the Brief adds it up, for example `Total time 20:30 · brief 16:00 · amendments +4:30`. It shows once the Task has an Amendment.

Each card's header shows:

* A **blue dot** for the Brief or an **orange dot** for an Amendment. Hover the dot for *Brief* or *Amendment 2*.
* Its **label**: Task Brief or the Amendment label.
* The date it was added.
* The time: the Brief's own estimated time, for example `16:00`, or the Amendment's extra time, for example `+3:00`. An Amendment that adds no time shows none.

An open card ends with a small line saying who last edited it and when, or who added it.

{% hint style="info" %}
**Great for** a Client who keeps asking for "one more change". The Total time line and the numbered Amendments show the account executive, at a glance, how far the Task has grown since the original Brief.
{% endhint %}

### Edit, print or share a Brief or Amendment

Each card has four icons: **Copy link**, **Print**, **Edit** (pencil) and **More** (⋯, which holds **Delete**). On an open card they sit at the top of the card; on a closed card they appear when you hover its header. On a closed Job, only **Copy link** and **Print** are offered.

{% stepper %}
{% step %}
**Edit:** click the pencil, make your changes, then click **Save**. An Amendment's **Extra Time** can be changed here too.
{% endstep %}

{% step %}
**Print:** click the printer icon. Agencydesk prepares an A4 page with your agency's letterhead, a summary box (Client, Job, Task, date added and time), the Brief or Amendment and the names of its attached documents, then opens your browser's print dialog. Choose **Save as PDF** to keep a file.
{% endstep %}

{% step %}
**Copy link:** click the link icon. The link opens the Job's Tasks tab with this Task's **Brief** tab showing and only that card open, so a colleague lands straight on the Amendment you mean.
{% endstep %}
{% endstepper %}

The Client contact and Account Executive are printed when you print from the Job itself. Printed from elsewhere, such as My Desk, they are left out.

### Tick checklists while reading

<figure><img src="https://1157247567-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FB7D6eF196PUKFr153UEk%2Fuploads%2F7dTsWogMSlgDp2PDuHOn%2Fagencydesk-task-brief-checklist-table.png?alt=media" alt="Open Task Brief with a format table, copy guidelines and a review checklist with two items ticked"><figcaption><p>Tick checklist items straight in the saved Brief.</p></figcaption></figure>

{% stepper %}
{% step %}
Open a saved Task Brief or Amendment on an open Job.
{% endstep %}

{% step %}
Tick or untick a checklist item directly in the saved text. It saves immediately; you do not need to open Edit for a tick.
{% endstep %}

{% step %}
Wait for the save before ticking another item. If **Checklist item not saved** appears, the tick is put back; check the saved state before trying again.
{% endstep %}
{% endstepper %}

When you are already editing the Brief or Amendment, checklist changes are part of that edit and need **SAVE**. Closed Jobs keep their checklists read-only.

### Recover an unsaved Brief or Amendment

Task Brief and Amendment editors keep a copy in your browser while you write. If the slider closes or you change tabs before saving, reopen the same Task's **Brief** tab and look for an **Unsaved … draft** card.

{% stepper %}
{% step %}
Open the same Task and return to **Brief** in the same browser.
{% endstep %}

{% step %}
Check the draft's preview and time, then click **Restore draft** on the copy you want.
{% endstep %}

{% step %}
Review the recovered content. An Amendment also restores its label and additional time.
{% endstep %}

{% step %}
If the saved content has changed since the draft started, compare the recovered text with the current saved version before saving.
{% endstep %}

{% step %}
Click **Add Brief**, **Add Amendment** or **Save**, according to the form, to save the recovered work.
{% endstep %}
{% endstepper %}

{% hint style="info" %}
Restore opens an editable copy; it does not publish or merge your changes. If an Amendment save was not confirmed, check the saved Amendments before retrying so you do not create the same change twice.
{% endhint %}

To cancel on purpose, click **Cancel**. If you have entered anything, choose **Keep editing** or **Yes, cancel**; an untouched form simply closes. **Yes, cancel** clears that editor's unsaved copy; it does not delete an existing saved Brief or Amendment. To remove a recovery card you no longer need, use **Discard draft** and confirm.

* Recovery belongs to the same signed-in person, Task and browser. It does not move to another browser or device.
* Clearing browser data or closing a private window can remove the copy. A card marked **available for this visit only** needs restoring and saving, or copying out, before you refresh.
* Draft text does not recover selected files or unfinished uploads. Check documents again before saving.

{% hint style="success" %}
**Example.** An account executive is writing up a Client's extra round of changes when the Task slider closes. Reopening the Task and restoring the Amendment brings back the wording, label and extra hours, so they can check it and save without rewriting the scope.
{% endhint %}

### Documents

Documents can be dragged into the drop area on a Brief or an Amendment, or selected from your computer. Each attached file shows its name, the date and time it was added and its size, with icons to delete, preview or download it.

Documents attached anywhere on the Task count towards the paperclip on the Tasks tab, and also appear in [Central](https://help.agencydesk.io/jobs/central.md#documents).

## Notes tab

Notes put information on a Task where anyone opening it will see it.

{% stepper %}
{% step %}
On an open Job, open the Task's **Notes** tab and click **Write a note…**.
{% endstep %}

{% step %}
Write the note. Type **@** and choose a person if the note needs their attention. The compact toolbar offers text formatting, lists and links.
{% endstep %}

{% step %}
Click **Add note** to save it, or **Cancel** to close the editor without adding it.
{% endstep %}
{% endstepper %}

Pressing Enter in the editor adds a new line; use the button to save. Each saved Note shows its author and time. If a save fails, the draft stays in the editor so you can check it and retry.

* Type **@** to direct a Note at someone. It then appears in their notifications, opened from the bell at the top right of Agencydesk.
* Click **Reply** on a Note, write the response, then click **Reply** to save it. Replies attach to the main Note, keeping each conversation to two levels.
* Notes show as a **speech bubble** with a count on the Tasks tab.
* Notes also appear in the Job's [Central](https://help.agencydesk.io/jobs/central.md) tab, together with every other Task's Notes.

Hover over your own saved Note or reply to find **Edit** and **Delete**. Edits need **Save**; delete asks for confirmation. Closed Jobs keep Notes read-only.

{% hint style="info" %}
Tagging someone with **@** in a Note, a reply, a Task Brief, an Amendment or the [Job Brief](https://help.agencydesk.io/jobs/managing-jobs.md#write-the-job-brief) sends them a [notification](https://help.agencydesk.io/my-desk/notifications.md). You are never notified about your own tags.
{% endhint %}

{% hint style="info" %}
Notes work best as information rather than conversation: recording the Client's feedback wording, flagging that assets are still outstanding, or tagging the person who needs to supply something.
{% endhint %}

## Time tab

The Time tab lists every entry logged against the Task, grouped by day. Time reaches it from the timer and **Commit Time** on [My Desk](https://help.agencydesk.io/my-desk/my-desk.md), and rolls up into [Timesheets](https://help.agencydesk.io/task-schedule/timesheets.md).

Click **+ Add Time** to log time by hand.

| Column     | What it shows                                                                           |
| ---------- | --------------------------------------------------------------------------------------- |
| **Source** | **Timer** or **Manual**: whether the time was tracked with the timer or entered by hand |
| **Time**   | The amount of time tracked or submitted                                                 |
| **When**   | When the timer was last stopped or paused                                               |

Each entry shows the person's name and the note they saved with the time.

**When** is worth reading carefully. It records the moment the tracking actually stopped, not the moment the person got round to committing it. Someone who stops work at 2pm and commits the time at 5pm still shows 2pm.

{% hint style="info" %}
That is what makes the Time tab usable as an audit trail. Time reads against when the work happened, so a Task queried weeks later can be reconstructed accurately.
{% endhint %}

{% hint style="warning" %}
Adding or editing time by hand requires permission. It is given per person by ticking **Can add and edit tracked time** on their profile under [Users](https://help.agencydesk.io/company-settings/users.md).

With that permission, hovering over a time entry shows a **pencil** and a **trash** icon for editing or deleting it. Without it, the log is read only.
{% endhint %}

{% hint style="info" %}
Deleting time entries is also the first step in unwinding a Task back to Draft, and in [deleting a Job that is already in progress](https://help.agencydesk.io/jobs/managing-jobs.md#unwinding-a-job-that-is-already-in-progress).
{% endhint %}

## Common questions

### Why can't I assign people to a Task?

Assigning needs Manager access or higher, and the Task must be active and not complete, on an open Job. Draft Tasks have no Assigned to section until they are activated.

### What does the capacity percentage in the assign popup mean?

It is how much of that person's time is still free across the next two weeks of scheduled work. Green is 50% or more, orange 20% to 49%, pink below 20%. Click it to see their next 7 days, leave included.

### Why isn't someone listed when I assign a Task?

Only timesheet users are listed. People whose account is inactive are shown but can't be switched on. Use **Search** to find someone further down the list.

### The reviewer gave Feedback. Where is my Task?

It stays in your **In Review** column on My Desk with an orange **Feedback** tag, and its timer is available again. Make the changes, then commit your time and tick **Send for Review** again. Read the reviewer's message on the Task's **Reviews** tab.

### Does approving a review complete the Task?

Only if the reviewer ticks **Mark task complete for me**, which completes the Task for everyone assigned. Leave it unticked unless the whole Task is finished.

### Why can't I change a Task's rate or estimate?

Active and In Review Tasks lock them, and a Task on a draft or issued Invoice has no unlock at all. Add an [Amendment](#adding-an-amendment) for extra hours instead.

### Why can't I edit an invoiced Task's name or description?

Once a Task is on a draft or issued Invoice, its Task Name and Description are locked, like its rate and estimate, so Job Costing keeps matching the Invoice the Client has. Use an [Amendment](#adding-an-amendment) to record new instructions.

### How do I save a Task Brief or Amendment as a PDF?

Click the **Print** icon on its card on the Brief tab, then choose **Save as PDF** in your browser's print dialog.

### How do I send a colleague straight to one Amendment?

Click the **Copy link** icon on that Amendment's card and paste the link. It opens the Task's Brief tab with only that Amendment open.

### I marked my part complete by mistake. How do I undo it?

Open the Task, find your own row under **Assigned to**, open its **...** menu and choose **Mark Not Completed**.

### Why did someone disappear from a Task when I deactivated them?

A person who has tracked no time is removed from the Task entirely when deactivated. Someone with tracked time stays, with their estimate set to what they tracked.

## Related

* [Job Costing](https://help.agencydesk.io/jobs/job-costing.md)
* [Timeline](https://help.agencydesk.io/jobs/timeline.md)
* [Central](https://help.agencydesk.io/jobs/central.md)
* [My Desk](https://help.agencydesk.io/my-desk/my-desk.md)
* [Resource Planner](https://help.agencydesk.io/task-schedule/resource-planner.md)
* [Timesheets](https://help.agencydesk.io/task-schedule/timesheets.md)
* [Users](https://help.agencydesk.io/company-settings/users.md)
* [Task Types](https://help.agencydesk.io/company-settings/rate-card/task-types.md)
* [Brief Templates](https://help.agencydesk.io/company-settings/brief-templates.md)
* [Global Tags](https://help.agencydesk.io/company-settings/general/global-tags.md)


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://help.agencydesk.io/jobs/tasks.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.